Commentary
Social media commentary and discussion

The Chain of Lakes: Zone 7's Local Water Future
A $356.5 million pipeline project that connects Zone 7's local reservoirs to its treatment plant. This is the infrastructure bet on local water supply.

Delta Conveyance: A $443 Million Question
Zone 7's share of the Delta Conveyance Project is estimated at $443 million — and the board hasn't committed to construction yet. Here's how I think about it.

Groundwater: The Aquifer Under Our Feet
Zone 7's groundwater basin holds 254,000 acre-feet — but PFAS has taken 40% of production offline. The Regional Groundwater Development project aims to bring it back.

Sites Reservoir: New Water North of the Delta
Zone 7 is one of 24 agencies investing in Sites Reservoir — a new water source that doesn't depend on Delta conveyance. Construction decision expected this year.

What the Capital Plan Means for Water Rates
Zone 7's new CIP shifts $209 million from developer-funded to ratepayer-funded projects. That rate pressure signal deserves an honest conversation.

Our Water Supply Is Less Reliable Than You Think
The State Water Project delivers just 54% of Zone 7's contractual allocation — and that number is heading down. Local supply investment is not optional.

37 Miles of Flood Protection
Zone 7 manages 37 miles of engineered flood channels across the Tri-Valley. Deferred maintenance isn't savings — it's a bill we're handing to our neighbors.

PFAS in the Tri-Valley: Trust the Science, Verify the Data
Zone 7 is doing serious work on PFAS. A board member's job is to make sure the monitoring keeps pace with the treatment.